Residential development Alpenland

In the center of St. Johann im Pongau, the construction of a residential complex consisting of a two-story underground parking garage and two residential buildings with five floors each was planned. Our office was commissioned with the planning of the excavation support. This was done by free slopes, nailed shotcrete protections and underpinning of the existing neighboring buildings. Geotechnical calculations were carried out for this purpose and the results were summarized in a technical report. The proper execution was monitored within the scope of a geotechnical construction supervision.
Our tasks
- Execution planning of the excavation support incl. geotechnical calculations
- Preparation of a technical report on the excavation pit
- Geotechnical construction supervision