Bioethanol plant AustroCel
Construction of a facility consisting of several buildings on the premises of AustroCel Hallein GmbH.
Location
Hallein
Realization
2018 - 2019
Departments
Services
In words
On the premises of AustroCel Hallein GmbH, extensions in the form of a tank farm, fermentation and yeast recirculation and bottling plant were planned. As foundation measures for the individual plant and building sections, soil improvement was carried out by vibro-compaction and small drilled piles (GEWI piles) were installed. For part of the excavation pit, securing by means of nailed shotcrete was necessary. The construction of the excavation support and the foundation measures were monitored within the scope of geotechnical construction supervision.
Our tasks
- Supervision and evaluation of the subsoil investigation
- Excavation support and foundation concept
- Geotechnical construction supervision